Skip to content

Machinery & Production Lines

Tall Timbers Brewing Co. — Complete 15BBL Brewery System

From a single capacity brief to a complete commercial brewing system, TL coordinated equipment configuration, sourcing, production, quality control, shipping and installation support for a brewery in Western Australia.

  • Hospitality & Commercial
  • Food & Beverage Equipment
Installed stainless steel tanks and brewhouse equipment for the 15BBL brewery project in Manjimup, Western Australia
Installed brewery system · Manjimup, Western Australia
15BBL
Brewhouse Capacity
Western Australia
Project Destination
End-to-End
Project Coordination
Less than half
Comparable local procurement estimate at the time

Based on project-specific local procurement estimates at the time. Current project costs vary by specification, equipment scope and market conditions.

Project overview

The starting brief
was simple: 15BBL.

Tall Timbers Brewing Co. was developing a commercial brewery in Manjimup, Western Australia. The client defined the required production capacity; TL helped develop the equipment configuration to turn that brief into a complete working brewery.

The scope extended beyond individual machines. Malt handling, brewing, fermentation, cooling, cleaning, controls and keg handling needed to work together as one production system.

From capacity to complete system

One brief. A coordinated system.

  1. 0115BBL capacity
  2. 02Process requirements
  3. 03System configuration
  4. 04Technical specification
  5. 05Production & QC
  6. 06Shipping
  7. 07Installation & commissioning

The client defined the capacity. We helped turn it into a complete equipment solution.

Equipment scope

What We Coordinated

01

Malt Handling

Malt milling, grist handling and transfer equipment configured around the project requirements.

02

Brewhouse

15BBL mash / lauter and kettle / whirlpool system with a 30BBL hot liquor tank.

03

Fermentation

Multiple 15BBL fermentation vessels with temperature control, cooling and cleaning systems.

04

Cooling & Heat Exchange

Plate heat exchanger, glycol cooling, chillers, pumps and associated pipework.

05

Cleaning & Process Control

CIP system, sanitary piping, temperature monitoring, flow control and PLC-based process control.

06

Keg Handling

Commercial keg washing equipment integrated into the overall brewery setup.

Stainless steel fermentation vessels installed for the 15BBL brewery project in Western Australia
Fermentation vessels · Installed project equipment
Brewhouse vessel, access hatch and connected pipework at the installed 15BBL brewery
Brewhouse access and pipework · Installed system detail

More than equipment sourcing

A brewery is not a collection of standalone tanks.

Each component needs to work within the same production process, from malt handling and water preparation through brewing, cooling, fermentation, cleaning and finished beer handling.

TL coordinated equipment dimensions, pipework, pumps, heat exchange, refrigeration, process control and electrical requirements. Site needs were incorporated into the specification, including 415V / 50Hz three-phase electrical requirements.

The system specification included Siemens PLC-based control for key brewing and cooling functions: temperature monitoring, pump control, fermentation cooling and refrigeration equipment.

Malt handling equipment and brewhouse vessels within the installed brewery system
Malt handling and brewhouse equipment within the installed system.

Production & Quality Control

Following the details
through production.

TL’s Shanghai sourcing team remained involved through supplier communication, specification review, production follow-up, component checks and equipment inspection, helping resolve issues before shipment.

Review areas included SUS304 stainless steel, internal finishing, sanitary pipework, weld quality, CIP cleaning access, temperature control and component compatibility. Testing and troubleshooting were coordinated around the agreed project requirements.

Checks across the system

  • Materials & internal finishing
  • Sanitary pipework & weld quality
  • Cleaning access & temperature control
  • Component compatibility
  • Specification issues before shipment

From factory to Western Australia

Coordination beyond production.

TL remained involved through international freight, installation guidance, commissioning support and after-sales coordination, keeping the equipment requirements connected to the project’s delivery and operating needs.

  1. 01Production
  2. 02Inspection
  3. 03Packing
  4. 04International shipping
  5. 05Installation guidance
  6. 06Commissioning support
  7. 07After-sales coordination

Commercial outcome

Less
than half.
Comparable local procurement estimate at the time

Direct sourcing.
Coordinated delivery.

By sourcing directly from specialist manufacturers and managing the project through the China-based sourcing team, the complete system was delivered at less than half the comparable local procurement estimate available to the client at the time.

The saving came from combining direct sourcing with specification development, production coordination, quality control and international supply management.

Project-specific historical comparison only. Current equipment costs vary by specification, supplier, freight, exchange rates and project requirements.

The result

From a 15BBL brief to
a complete working brewery.

The project became a working commercial brewery in Manjimup, Western Australia. The result went beyond shipping equipment: individual systems were coordinated into a brewery capable of ongoing operation.

Installed commercial brewery equipment within the Manjimup site in Western Australia
Commercial brewery equipment installed at the Manjimup project site.

Not just 15BBL

Configured around
your production requirements.

TL has also sourced smaller brewery systems for hospitality operators. Our role is not tied to one fixed brewery size or standard equipment package.

  • Production capacity
  • Available floor area
  • Utilities
  • Operating workflow
  • Automation requirements
  • Budget
  • Expansion plans
Discuss a Brewery or Production Equipment Project